I had
another reply failure, so here’s the text of the failed
message:
In my
case, the ruling grade of 2% is in the helix, so it’s out of sight, over the
horizon, over the rainbow, or whatever. I’ve already done pulling power on my
locomotives on a straight 2% grade to get an idea of how many NMRA specification
weighted cars they can pull. I don’t have the helix built yet, so I can’t repeat
the tests on the helix curve.
I
have the option of using helpers on the helix, or doubling the hill, which may
be necessary when using steam power. There is a helper pocket at the bottom of
the helix, and a passing track at the top of the helix.
Nelson
Moyer