Re: BLI NYC USRA Steel Box Car Corrections Needed
Jon Miller <atsfus@...>
On 5/2/2017 9:09 PM,
FrederickJct@... [STMFC] wrote:
removed the bolster from the plastic BLI underframe and replaced it with a block of styrene .160" high drilled and reamed to fit over the cast post on the BLI floor. Then I drilled and tapped the post for a 2-56 screw. I just looked at Andy's pictures. Seems
another route might be to build a dam on the coupler end and
fill the hole with resin, frame needs to be level. Save a lot
of filing. Then drill and tap. Thoughts??? -- Jon Miller For me time stopped in 1941 Digitrax Chief/Zephyr systems, JMRI User NMRA Life member #2623 Member SFRH&MS
|
|