Re: G-N versus Consist Data for train construction
I designed a track plan proposal for a club in 1500 sq ft that
toggle quoted messageShow quoted text
included a hidden three level stage/elongated helix that would have provided 700-1000 linear ft of level staging (18-24 long trains) -- but the staging operator would have had a 36" duck under. So they voted a plan with NO staging at all and a yard that is about 70" high off the floor. Go figure. Anticipating the sheer joy of operating such a layout, I quietly resigned. Tim O'Connor
"now you know why there is never enough staging space."
|
|